Skip to content

Service

Flatbed & Open Deck

Flatbed freight depends on accurate dimensions, weight and securement planning. Tarping, straps, chains and loading method are agreed before the truck is dispatched.

Best-fit shipments

  • Construction and building material deliveries to job sites
  • Steel, pipe, lumber and crated equipment
  • Freight loaded by crane, forklift or overhead hoist

Dimensions and securement

Provide length, width, height, weight, piece count, centre of gravity notes, and whether tarping is required. Securement is planned to the commodity, not applied generically.

Loading and site access

Confirm loading method, site ground conditions, overhead obstructions and available unloading equipment at delivery.

Oversize planning

Loads exceeding legal dimensions require permits and, in some jurisdictions, escorts. Lead time increases accordingly.

Frequently asked

Moving flatbed & open deck freight?

Send the shipment details and dispatch will come back with equipment fit, timing and pricing.

Call Dispatch Request Quote